SHIPREPAIR
YARD

In period from November - December 2018 dock repairs of m/v «Tanais Flyer» were carried out. Hull, hatch covers and cargo holds cleaning and painting were performed (inner side - total area 18100 m2). Rudder and tailashaft were repaired. Repair of cargo cranes ropes was carried out, as well as winches and sheaves inspection. Gas free inspection of all fuel tanks was carried out with subsequent steam heating pipeline testing. Steelwork was repaired in scope of 10 ton. Partial repair of main engine was carried out. Repair of different pumps and electric motors was carried out - more than 10 pcs. Pipeline systems were repaired in scope of 150 rm. Despite of unfavourable weather conditions all works were carried out in agreed term and submitted to the Owner and Class.