November 2019 – Repair of m/v «SOTIRIA».

Grit blasting, painting of Hull and Cargo Holds– total 15252 m2 .

Withdrawal of tail-shaft and rudder blade, clearances measurement, inspection report. Light steel renewal on Main Deck according to shipyard inspection report.

Repair of different systems pipelines. Steel constructions repair according . Repair of Engine room equipment according to preliminary specification.

25.11.2019